One: After the mixing mortar is mixed in proportion, the viscosity of the mortar can be adjusted according to the construction site.
Second: the construction environment and the temperature of the base wall should not be lower than 5 ° C, the wind level is below 5, to avoid rainy days.
Three: Evenly press the insulation board, you can not slap the vibration.
Four: Within 48 hours after the paste is completed, the construction of the next process cannot be carried out, and touch, knock and vibration should be avoided at the same time.
5. If the wind is above level 5 or rains, protective measures should be taken.
Sixth: The mixed mortar should be used up within 2 hours, and the solidified and hardened mortar should not be used for the second time.
Seven: It is strictly forbidden to add sand, cement and other additives on site.