Approach procedures
1, with the construction responsible person, real estate property staff about the time to do a good job.
2. Clearly notice the owner of the decoration, the owner and the property signed the relevant liability contract.
3, the property unit and the construction team signed a construction responsibility contract.
4. The owner pays for the clearing of the freight (based on the budget negotiation).
5, the owner or decoration company for the decoration team for "zone pass", the construction staff deposit.
6, a clear decoration period, plus 3-7 days properly to avoid delay.
Construction team arrival
1, to do property procedures
2. Acceptance of the original house on site
3, hydropower, woodworking equipment approach
4. Workers entering accommodation and daily necessities
5, the basic water and electricity materials scheduled (if it is DIY construction)
6, clear design matters, such as switches, sockets, retained and dismantled walls, bathroom drainage arrangements, special treatment site
Acceptance acceptance
1. Doors and Windows: The hardware parts are complete, closed tightly without water leakage, and the switch is smooth.
2. The top surface of the wall: whether it is smooth, vertical or cracked, whether there is any problem with the structure, and there is no water leakage.
3, kitchen, health, balcony: waterproof layer without water seepage, ground height difference 2cm, no leaking pipes, downpipe drainage smooth.
4. Design conditions: The design conditions are completely correct.
Suggestion: Both parties should handle the transfer, acceptance of written documents and signed by both parties
House Decoration Precautions Decoration Precautions Home Decoration Precautions Decoration Design Switch Socket House Layout Decoration Find Decoration Company How Do You Design Toilet Bathroom Waterproof Bathroom Door Bathroom Leakage
The present invention provides a multifunctional pull faucet, comprising: a faucet body, a drawing part is provided at the water outlet port thereof, and the drawing part is connected to a main channel, wherein at least three are provided in the faucet body A branch channel, and the three branch channels are all connected to the main channel. A multifunctional pull faucet provided by the present invention, wherein the hot water channel, the cold water channel and the water purification channel (pure water channel) are all connected to the main channel , And the main channel is connected with the drawing part on the main body of the faucet, so that the drawing part can obtain the water quality (hot water, cold water, purified water or pure water) required by different users, thereby improving the user experience, and , By integrating the hot water channel, cold water channel and pure water channel (pure water channel) into the main channel, the internal structure of the faucet is simplified, and the production cost of the faucet is reduced.
Abs Plastic Shower,Shower Head Set,Brass Shower Head,Color Changing Shower Head
Yuyao Zelin Sanitary Ware Co., Ltd , https://www.kitchen-sinkfaucet.com