Inventory: bathroom waterproof rules

Xiao Bian wants to remind the owners that the waterproof of the bathroom is too big. If the waterproof quality of the bathroom is not enough, you will be beautifully decorated with clouds. Sending a small flood will make you "bubble". In this issue, we will Let me talk about the precautions for waterproofing the bathroom.

If the old house is refurbished, it is necessary to change the original floor tiles of the bathroom. After the original floor tiles are cut, it is necessary to first level the ground with cement mortar, and then do waterproof treatment. If the water is not leveled, there will be unevenness and leakage.

After leveling, it can prevent the waterproof coating from leaking due to uneven thickness. Before doing waterproofing, it is necessary to clean the floor and repeat it with water-repellent paint for 2 to 3 times. The brush should be light and thin, and the last time it is waterproof, it can be brushed once.

The joint between the wall and the ground and the joint between the water and the upper and lower sides of the pipe are the places that are most likely to present problems. It is inevitable to urge the workers to dispose of these corners and corners, and the waterproof coating must be applied in place.

Require the decoration team to make the cement roots for the upper and lower pipes of the kitchen and the bathroom. Brush the waterproof coating from 10 to 20 cm from the ground, then re-do the waterproof layer on the ground, and add the original waterproof layer to form a composite waterproof layer. Strengthen water resistance.

Make wall waterproofing before wall covering tiles. In the ordinary waterproof treatment, the wall surface should be waterproofed to a height of 30 cm. However, for a non-load-bearing light-weight wall, the entire wall should be waterproof, at least 1.8 m high. If a bathtub is used, the height of the wall waterproofing paint adjacent to the bathtub is also higher than the upper edge of the bathtub.

After the waterproofing project is completed, seal the door and the drain, fill the toilet floor with water to reach the height of the liquid level, and make a mark. If there is no clear drop in the liquid level within 24 hours, no seepage is found on the roof of the house downstairs. Leak, waterproof will pass. If the acceptance fails, the waterproof project must be redone and re-inspected.

Regarding the acceptance of the waterproof construction of the lightweight wall, the water spray test should be accepted. Even if the water pipe is used for the waterproof coating, the surface is not continuously sprayed for 3 minutes from the top to the bottom. After 4 hours, the other side of the wall can be inspected. Whether it will present a saturated scene, if there is no immersion scene, it can pass the wall waterproof construction acceptance.

Maijin high-end Aluminum Oxide Coating Spc Flooring is the high-ranking Aluminum Oxide wear-resistant material and the stone plastic core union together the aggrandizement type wear-resisting SPC Flooring. This flooring has stain resistance and friction resistance.
Maijin high-end Aluminum Oxide Coating SPC Flooring has been used environmentally friendly formula materials, do not contain heavy metals, phthalates, formaldehyde and other harmful substances.

High End Aluminum Oxide Coating SPC Flooring

Coating Spc Flooring,Spc Deco Floor,Aluminum Oxide Spc Flooring,The Highest Hardness Spc Flooring

Dalian Huimingmaijin New Materials Co.,Ltd , https://www.maijinfloor.com

This entry was posted in on