The panel is generally made of plywood (pentar panel) with a thickness of not less than 3mm. The color and pattern should be as similar as possible. When the panel of logs is used as a panel, the dried hardwood such as red and white pine, oak, and ash is generally used. The moisture content is not Greater than 12%. The thickness is not less than 20mm, and the texture is required to be straight, uniform in color, and the pattern is similar, and no fringes are allowed. Distortion, cracks, discoloration, etc.
Wall soft pack construction preparation
1, material requirements:
The tree species, specifications, grades, moisture content, and anti-corrosion treatment of wood frames, keels, floors, panels, etc., of flexible wall coverings must comply with the requirements of the design drawings and the “Code for the Construction and Acceptance of Wood Structure Engineeringâ€.
Soft fabrics and other filling materials must meet the design requirements, and should comply with the relevant provisions of the interior decoration design fire protection.
The aggregate is generally used in red and white pine drying materials, the moisture content is not more than 12%, the thickness should be based on the design requirements, there must be no decay, thrift, chapped, twisted and other rickets, and pre-preservation treatment.
The panel is generally made of plywood (pentar panel) with a thickness of not less than 3mm. The color and pattern should be as similar as possible. When the panel of logs is used as a panel, the dried hardwood such as red and white pine, oak, and ash is generally used. The moisture content is not Greater than 12%. The thickness is not less than 20mm, and the texture is required to be straight, uniform in color, and the pattern is similar, and no fringes are allowed. Distortion, cracks, discoloration, etc.
The fabrics used in the outer trim, such as beading, sub-frames, and wood-faced fabrics, are generally made of semi-finished materials that are processed by the factory. The moisture content is not more than 12%, and the thickness should be based on the design requirements and the appearance of good materials without any problems; After antiseptic treatment.
Accessories are moisture-proof paper or linoleum, latex, nails (nail length should be 2 to 2.5 times the thickness of the surface layer), wood screws, wood sandpaper, sodium fluoride (purity should be above 75%, free hydrogen fluoride, its viscosity Should pass No. 120 sieve) or petroleum asphalt (usually No. 10, No. 30 construction petroleum asphalt).
If the design adopts a lightweight partition method, its base layer, surface layer and other filling materials must meet the design requirements and supporting use.
Overlay materials and practices must meet the requirements of the design drawings and comply with the relevant provisions of the interior decoration fire protection design.
2, the main equipment:
Woodworking Workbench, Chainsaw, Electric Planer, Impact Drill, Pistol Drill, Cut, Cut Fabric Cloth, Leather Workbench, Steel Ruler (1m Long), Cut Knife, Towel, Plastic Bucket, Plastic Washbasin, Oil Scraping Plates, Small rolls, Knifes, Brushes, Brush pens, Wipes or cotton, Sandpaper, Long tape measure, Box ruler, Hammer, Wood chisels of various shapes, Wire saws, Aluminum rulers, Square rulers, Multitools, Projectiles Lines with pink bag, ink fountain, small white line, line, pallets, line fall, red pencils, tool bags and so on.
3, operating conditions:
The plastering of concrete and walls has been completed. The base layer has been laid according to design requirements. The cement mortar leveling layer has been wiped and brushed with cold base oil, and after drying, the moisture content is not more than 8%; the moisture content of wood products The rate must not exceed 12%.
Water and electricity and equipment, reserved on the top wall have been completed.
The suspended ceiling project in the room was basically completed and met the design requirements.
In the room, the wood protection wall and the fine wood decoration floor have been basically completed and meet the design requirements.
Technical indicators and quality requirements should be emphasized when constructing technical personnel. Before large-scale construction. Should be done between the model, the quality inspection department after passing the qualification, before the organization of the team construction.
Wall construction decoration design room cement decoration design model room design decoration design model room
Aluminum Alloy Handle,Circular Door Handle,Invisible Door Handle,Bathroom Glass Door Handle
Zhaoqing Muyi Hardware Products Co., Ltd , https://www.muyihardware.com