New house decoration should pay attention to the waterproof process of the bathroom. If there is a slight difference in the pool, it may bury hidden dangers, which will seriously affect the quality of life in the future. As for the bathroom waterproof construction plan , do you have a clear understanding? Today I will introduce you to the bathroom waterproof construction plan and some details of the bathroom waterproofing that cannot be ignored.
Toilet waterproof construction plan
1. Before the toilet is waterproof, it needs to be filled with cement mortar, and leave a certain slope at the position of the floor drain, so that the water can easily flow out through the floor drain, and it is not easy to produce water. If the leveling process is omitted for a long time, the waterproof layer may crack.
2. When waterproofing the wall, it is best to be able to brush the whole surface. Of course, some construction masters will brush to the 1.8m effect, depending on the actual situation.
3. The waterproof paint used in the bathroom floor drain, wall corner, pipe root, etc. is preferably highly elastic and highly flexible, so as to better protect the place from water seepage. Before painting the waterproof coating, you need to use cement to smooth the sliding corner of the pipe root, and paste 1 ~ 2 layers of glass cloth.
4. If you use polyurethane waterproof coating, you need to keep the thickness above 1.5mm. This cannot be determined according to the number of brushes. And the construction process of polyurethane waterproof coating is to paint the roots and corners of the pipe first, and wait for it to dry out, then apply a large area of ​​paint.
Some details of bathroom waterproofing
1. Before making the bathroom waterproof, the most important thing is to clean the dust and other debris from the base, and the base wall must be hard, and there will be no peeling or powdering. If yes, don't rush to do waterproofing process, you need to deal with the grassroots well and under construction.
2. There are three places in the bathroom that are very difficult to handle, namely the drain, the root of the pipe, and the yin and yang corners. These places require special treatment, and before they are waterproofed, they must be leveled with cement mortar, so as to effectively avoid the later seepage.
3. When doing bathroom waterproofing, do not just make the ground, and the waterproofing of the wall can not be ignored. All walls within 30cm from the ground need to be waterproofed to prevent water from penetrating into the wall. If you are going to make a bathtub in the bathroom, the waterproof layer must be higher than the bathtub.
Editor's conclusion: After reading the waterproof construction plan of the bathroom and some details of the bathroom waterproofing , do you have more understanding? When we do waterproofing, we need special details, such as floor drains and pipes. Root treatment to avoid the problem of water leakage in the later stage.
What, the decoration still uses his own money? ! The Qi family is decorated in installments, with an ultra-low annual interest rate of 3.55% and a maximum loan of 1 million. Apply now to enjoy the discount
Reading Desk Lamp,Wireless Desk Lamp,Table Lamp For Study Desk,Usb Desk Lamp
NINGBO ZHENGUO INTELLINGENT LIGHTING CO.,LTD , https://www.intellingentlighting.com