Nowadays, in the warm installation of homes, most of them use plumbing. Because of the relatively high requirements for installation technology, improper installation will not only affect the results of later use, but also make it more troublesome to repair. Let’s take a look at how a good floor heating company can correctly and standardly install floor heating.
Pre-installation
Prior to the formal paving of the ground facilities, the design drawings should be confirmed and the site should be cleaned up. Then install the temperature control line and sub-collector, these processes are also very important, which involves the slot, assembly and so on. These issues are related to the normal use of warmth in the future and must be properly and standardly installed.
Ready to work
After entering the site, clean up the construction site and determine the installation positions of the main engine (wall-hung boiler) and the sub-water collector, so as to prepare for the subsequent construction.
Installation temperature control line
Slot the place where the water collecting device is installed, and prepare the buried temperature control line. And put the relevant temperature control wire around it for connection.
Villa design decoration company boiler room
China Elevator Door System, Elevator Door Locking System supplier & manufacturer, offer low price and high quality elevator door pulley system, elevator door mechanical system etc. We are the most professional door system manufacturer in China. We can provide any type of door system you want. MS series and KS series are all our most popular and famous series.
Elevator Door System,Elevator Door Locking System,Elevator Door Pulley System,Elevator Door Mechanical System
Suzhou Stable Trade Co., Ltd , https://www.stable-elevator.com