Home installation integrated ceiling installation method

Now many people have ceiling decoration, then how to install home decoration integrated ceiling? Follow the small series together to understand how to install the home-installed ceiling.

Home installation integrated ceiling installation method

1. Suspender-elevation ceiling elevation line-- Brush black paint above the elevation line--Installing water, electricity and ventilation ducts--Installing the surrounding circle of the mineral wool board--Preliminary installation of the metal grille--Set the ceiling arching position And height-Adjust the height of fire sprinkler head according to the ceiling arch line--Equipment commissioning--Adjust the metal grille according to the height of the arching--Adjust the fire sprinkler head straight--Install the lamp--Tune the grille straight Shun.

2. Ceiling plan location rules: Due to the 120m east-west length of each storey, 34.7m wide north-south, and the spacing of the column nets of 8.0m*8.0m, the area is relatively large. Therefore, the metal grille and mineral wool board must be handled well, between the ceiling and the ceiling. Vertical or parallel relationship between walls and columns. In this regard, the relevant axis should be measured to the facade of the wall pillars, and the base line should be pulled to find the rules for plastering, so as to ensure that the wall surface is parallel to the axis and two Adjacent faces are perpendicular to each other. This serves as a reference plane for the ceiling plane position.

3. Suspended ceiling arching and arching height: This project is not suitable for arching because of the long longitudinal dimension. The arching should be in the short-term north-south direction. The arching height can be about 1/200 of the 8m column spacing.

4. The plane position of the fire sprinkler head cannot coincide with the grille bar and should be straight in both directions. For this purpose, a treading curve greater than 900 can be made at the upper end of the fire sprinkler riser to fine-tune the sprinkler head. Plane position.

5. Equipment inspecting holes for indwelling: Because the various pipes in the grille ceiling are equipped with regulating valves, inspection holes must be placed in the corresponding positions, and the inspection hole positions are not vertical and horizontal lines. The following methods can be adopted: cutting into holes first , And then in the hole around the angle aluminum (the first angle aluminum brush and the grille the same color), the corner of the aluminum skin recessed into the grille skin 2mm, and finally cut the hole down the grid bar after the adjustment of the assembled and put in the corner Aluminum.

6. The treatment of the joints between the ceiling and the column: The L20mm*20mm angle aluminum can be used to connect with the square column, which can achieve the effect of coordinating with the ceiling keel of the mineral wool board. The cylindrical connection can be closed with Φ35 stainless steel pipe.

Reminder: For more information, please pay attention to the information on this website , or you can visit our offline experience directly.

More exciting recommendations

AIA integrated ceiling

Integrated ceiling installation method

Kitchen integrated ceiling

Haichuang integrated ceiling

Xilinmen ceiling

Aopu integrated ceiling price

Ceiling ceiling design ceiling installation home improvement door price stainless steel coating AIA integrated ceiling price ceiling price kitchen integrated ceiling grille lamp

COVID-19

Inactivated Virus Transport Tube,Sample Specimen Preservation Solution,Inactivated Viral Transport Medium,Lab Cleaning Reagents Rnase Degradation

Guangzhou Baybio Bio-tech Co., Ltd , https://www.gzbaybio.com

This entry was posted in on