2, must be pressurized after installation. Pressurization tests are generally performed at 1.5 times the water pressure, and there should be no leakage during the test.
3. A simple test method without pressurization is not completely feasible. 1) Close the water main valve. (ie the water meter switch in front of the water meter) 2) Open the faucet in the room for 20 minutes to ensure that no water is dripped and then close all the faucets. 3) Turn off the water inlet switch of the device, such as a toilet tank and a washing machine. 4) Open the main valve of the water pipe. 5) Check whether the water meter is moving 20 minutes after opening the main valve, including slow walking. If there is movement, it is leaking. If you don't move around, it may be okay. (If there is a problem with the water meter or micro-permeation of the water pipe, it may be difficult to determine.) Therefore, it is recommended that a hydrostatic test be conducted after the completion of the construction. Generally, 8 kg of pressure will be applied for 20-30 minutes. (It's best to see for yourself)
4, the direction of the water pipe: It is recommended that the pipe is safest. The main reason is that most of the waterway reforms go through dark pipes, while the water is characterized by low water flow. If the pipeline goes underground, it is difficult to find water leakage in time. Only if the water is diffused into the Jinshan or the floor is deformed and leaked downstairs, water leakage will be discovered, and it is difficult to detect leaks due to buried pipes. At this time, the huge losses are even more irreversible. They have even seriously affected friendly neighborhood relations; if the water pipes are at the top, the cost of water reform may be higher, but as a long-term investment, it is worthwhile. When the water pipe is at the top, even if it leaks, it can be discovered in time and is easy to overhaul. The loss is also small.
5, in daily life, if you find the following situation, please check the relevant pipeline as soon as possible:
Pipes go underground:
1) Moldy foam on the surface of the wall paint 2) Baseboard or wood floor black and fine foam on the surface
Water pipe to go to the top:
1) Dampness or water drop on the top of the canopy
Nature Flooring Del Floor Switch Faucet Toilet Room Paint Floor Tiles
Rhein Lighting has developed a line of the high voltage 5050 LED strip Light which is perfect for home, office and outdoor decoration. The light strip has multiple colors such as white, red, blue, yellow, green and RGB etc. The strip light has clear PVC tubing, which is flexible, transparent and durable and it can be shaped, formed or bent in any angle to perfectly fit the space being decorated.
The led rope light has come with different options of lengths in a reel, which has 50ft, 100ft and 150ft. The 120v Led Strip Light can be cut in every 1.64ft/0.5m along the cutting marks, without damaging the rest strips.
The Led strip light is ETL certified, which is Eco-Friendly, No splash and UV, without mercury and no damage to human and environment.
Rhein Lighting is specialized in the design and manufacture of led panel downlight, led slim down light, backlit Led Panel Light, led rope light, led strip light, led plant light and Led Grow Light etc.
Rgb Led Strip,Govee Led Lights,Govee Led Strip Lights,Daybetter Led Lights
Rhein Lighting Technology Co.,Ltd. , https://www.rheinlighting.com