Kitchens and bathrooms should be covered with non-slip, non-soiling and easy to clean tiles. The paving work should be done after the waterproof treatment, floor heightening and solidification, ceiling, wall facade finishes and bath and cabinet installation. details as follows:
>>>Recommendation: Which kitchen do you choose to decorate?
(1) The vertical and horizontal reference lines should be ejected, requiring an angle of 90 degrees or 45 degrees with the door frame.
(2) Remove tiles that do not meet quality requirements, such as large color difference, cracks, missing corners, glazed damage, and warpage.
(3) For each row, vertical or vertical lines shall be used for vertical inspection. Horizontal straightness and surface flatness.
(4) Non-full tiles should be laid outside the line of sight.
(5) Pure cement can be used for laying cement slurry, and 1:2 fine yarn slurry can also be used. The ash on the back of the brick should be full and full, and it should be made with a rubber hammer after paving.
(6) When the cement has not been solidified after the laying of the floor tiles, protective measures must be taken. It should not be subjected to gravity to prevent misalignment.
Flooring Cement Kitchen Doors Kitchen Doors Toilet Waterproof Whole Bathroom Bathroom Doors Bathroom Tiles
Elevator Guide Shoe,Guide Shoe For Elevator,Elevator Car Guide Shoes,Elevator Door Guide Shoe
MAURER TECHNOLOGIES CO., LTD. , https://www.maurer-elevator.com