Laying marble, granite essentials

Stones, whether laid on floors, walls or columns, must undergo primary treatment. The laying of stone on the ground is carried out after the completion of the ceiling and the facade of the wall. The floor is required to be flat and clean, and it is sprinkled and moistened 24 hours before. If the concrete floor is very smooth, hair should be cut to prevent “empty drums” when laying.

Precautions for laying stone on the ground include:

(1) Find the benchmark: The horizontal reference spring line is on the wall, and the vertical and horizontal reference lines are ejected from the center point of the room.

(2) Before laying, try to fight, test row, pay attention to pattern, color, and make a mark, in order to avoid mistakes, rework.

(3) Laying cement slurry can be pure cement slurry or 1:2 cement fine mortar. Sprinkle water after 12 hours. After 24 hours, clean the surface of stone and trench joints.

(4) The slurry on the back of the stone should be even and plump, and be laid down horizontally to avoid misalignment due to gravity, and then use a rubber hammer to make it.

(5) Check horizontal and vertical and horizontal straightness after each row.

(6) The stone must be waxed and maintained after laying.

(7) If there is walking, you should shop for it first. The baseboard should be laid on the floor.

Flooring cement

Toilet

European Bathrooms Rimless Wall Hung Toilets Ceramic Sanitary Wall hung Toilet Bathroom

Toilet,hot steam room,portable swim spa,backyard swim spa,hot tub swimming pool combo

Guangzhou Aijingsi Sanitary Products Co.,Ltd , https://www.infinityedgehottub.com

This entry was posted in on