Silver Spruce Resources Inc. (TSXV: SSE) is pleased to announce that it has signed Cabo Drilling of Springdale, NL to complete the 10,000-meter diamond drilling work in the Big Easy Gold/Silver project in New East Finland. The rig will arrive at the site in mid-June and test the hydrothermal mineralization zone in the altered zone, which is approximately 1.7 km long and 300 m wide. Highlights: - About 1,000 meters of drilling plan in 3-4 boreholes to test hydrothermal mineralization zones - 2011 Diamond Drilling - Best Mining Section: BE-11-3 internal gold and silver grades are 0.87 The 30.5 m section and the gold and silver grades of gram/ton and 33.5 g/t are 6.04 g/t and 114 g/ton respectively, including gold and silver grades of 6.05 g/t and 174 g/ Tons of 1.5 m mine section. ——Characteristics of typical near-surface hydrothermal systems such as feldspar and boiling texture found in core re-recording
7.5M Measuring Tape,Tape Measure Tool,Precision Tape Measure,Tape Measure For Sale
SHANGQIU CHAOYUE MEASURING TOOLS CO., LTD , https://www.equipmentool.com