Vacuum pump installation introduction

1, the vacuum pump should be installed on the ground strong and solid place, there should be sufficient room around for easy inspection, maintenance and repair. 2, under the base of the vacuum pump should maintain the level of the foundation, the corners of the base cushion pad rubber or recommended damping installation, ensure the smooth operation of the vacuum pump, small vibration. 3, the connection between the vacuum pump and the system should be sealed and reliable, the small vacuum pump can be used metal pipe connection seal with oil-resistant rubber, small vacuum pump can be connected with a vacuum hose, pipe diameter not less than vacuum pump suction caliber, Short and few elbows. (Weld pipe should be removed when the welding slag in the pipeline, non-destructive welding slag into the vacuum chamber.) 4, in the connecting pipe, the user can install the valve above the vacuum pump inlet and vacuum gauge, at any time to check the vacuum pump ultimate pressure. 5, according to motor signs connected to the power supply, and ground wire and install the appropriate specifications of the fuse and thermal relay. 6, the vacuum pump power test run, remove the motor belt to confirm the vacuum pump steering direction can be put into use only to prevent the vacuum pump reverse fuel injection. (Turn according to the direction of the shield instructions) 7, for the cooling water pump, according to the provisions connected to the cooling water. 8, such as vacuum pump inlet valve installation, the valve and the vacuum pump should be at the same time action. 9, when the vacuum pump exhaust gas affect the working environment, the exhaust port can be connected to the pipeline to remove or install the oil mist filter.

Camping Lantern

Camping Lantern,Cob Led Camping Light,Outdoor Camping Light,Led Tent Lamp

NINGBO ZHENGUO INTELLINGENT LIGHTING CO.,LTD , https://www.zguolight.com

This entry was posted in on