1. Chemical name: Distyryl bisbenzoxazole OB-1
Â
2.Technical conditions:Â
Purity: ≥ 99.95%
Appearance: Bright green crystalline powder
Melting point: 250 ~310ºC
Ash: ≤0.1%
Volatile:≤0.5%
Fineness: ≥ 100 meshÂ
3. Features:Â
Bright green crystalline powder---fluorescent brightener OB-1, insoluble in water, odorless, stable performance, the maximum absorption of wavelength spectrum is 370mm, it is mainly used in the synthesis of fiber and plastic.
Â
4.Usage and dosage:
Fully mix up the fluorescent brightener OB-1 with the raw materials, then molding processing. Fluorescent brightener OB-1 is commonly used in the amount of 0.01-0.03%, that is, each 100kg of the materials, the fluorescent brightener OB-1 takes 10-30g or can be adjusted according to the requirements of the product or test.
Â
5.Packaging and Storage:Â
20kg per carton, 25/30kg per fiber drum with PE liner, or as per the customers' requirements.Â
To avoid light, can be stored in cool and dry place for 24months.
Â
Notes:
A small amount of crystallization is allowed when storage over 2Â months, the effect will not be affected during the shelf life.
 FAQ:
1. What type of your company?
  We are engaged in manufacturing and sales of optical brighteners for more than 10 years, we are factory and trading company both.Â
Â
2. What's the procedures?
  Inquiry and offer---Order---Paid---Packing&Loading---Delivery---After-sales services.
Â
3. Can we get free sample?
  Yes, we could offer free sample for test.
Â
4. What's your warranty?
  3 years warranty.
Â
4. How to add your additives?
Mix our additives evenly with your materials around 8-10 min. And then take our dosage accordingly.
Â
5. Can you specially create formulation for our special demands?
Yes, we have professional engineer team to work for you.
Â
6. What certificates you have ?
    ISO9001:2008/MSDS/SGS/COA
Contact:
Ms. Molly
Sales managerÂ
Changsha Lianda Chemical Co.,Ltd.
Add: Rm.2222 Huida Building , No.259 South Mawangdui Rd.,
Yuhua district, Changsha, Hunan, China 410000
Tel: +86-731-8388 8220Â Â Â Â Â Â Â Â Fax: +86-731-88726158
Â
Â
Website: www.csldhg.com     http://csldhg.en.alibaba.com
Â
Solar Mounting System For Green House
The Installation of Mounting Unit
1. Make the concrete base according to solution drawing, locate embedded bolts and set out strings by Laser Level to ensure the centers of embedded bolts in the same elevation as accurate as possible on vertical, horizontal direction and at end face.
2. Locate the Anchor Plate on the concrete base and adjust the position according to solution drawing(remove M14 washer,M14 spring washer,and M14 nut if they are connected to embedded bolts now),and then fasten M14 washer, M14 spring washer, and M14 nut with the tightening torque of 60N.m.
3.Take out the Hexagon Bolt Kit with Post B Corrugated Gasket M12x95 and remove its nut, spring washer, one washer, and corrugated gasket. Insert the Post A, B, C in to Anchor Plate according to the Hexagon Bolt Kit with Corrugated Gasket M12x95 drawing and then fix them by two sets of Hexagon Bolt Kit with Corrugated Gasket M12*95. Post C Post A
4.Remove the bolt kits M12*90 from all the Posts and Pre-Assembled Supports and unfold the embedded Supports, fasten them on the Posts by bolt kits M12*90 according to the drawing.
Installation of Rails
1.Please check the length of Beam before place it onto the Pre-Assembled Supports, otherwise extend it with Splice forBeam first. There are 4 self-tapping screws in each side and total 8 self- tapping screws in both sides. We strongly recommend NOT extend the Beams on Preassembled Supports.
2.Before locate the Beams, mark the position of the Beam son the surface of Pre-Assembled Supports with maker pens according to solution drawing for easier installation. Place the Beams on the 55*80 Tube of Pre-Assembled Supports and fix it with C Clamp Kits. Install all the Beams in the same step. The tightening torque will be 20N.m. C Clamp Kit Side Beam(Please arrange 3-4 persons to install when the array is long.)
Installation of Solar Panels
1.Place the panels above the Beam 85, fixing it with Wide End Clamp Kit in the side and Inter Clamp Kit in the middle. Install all the panels in the same steps until complete installation of al panels. Fasten all the bolts with tightening torque of 10N.m.
2.Complete installation, and please inspect and make sure all the bolts are fastened.
Solar Panel Mounting Frames,Solar Panel Mounting Systems,Greenhouse Solar Mounting System,PV Mounting Systems
Hebei Honde Plastic & Metal Co., Ltd. , https://www.foundation-system.com