Home decoration acceptance is very important five steps have to see

Under normal circumstances, the construction quality is supervised by taking a personal eye on the site so that problems can be solved in time.

In fact, if it is an outsider in the decoration, even if it is soaked in the construction site every day, even if the decoration company has a problem, it cannot be seen. For those who suffer from lack of time, "staring at the site" is even more unrealistic. Therefore, if consumers can grasp the progress during the renovation process and carry out inspections in stages, they can avoid the pain of going around and control the quality of construction.

1, before entering

Whether the demolished and reformed project meets the requirements of the contract, whether there is a hidden safety hazard, whether the wall surface treatment is clean, and whether the quantity, grade, and specifications of the incoming material are in agreement with the prior agreement.

2, water circuit

The acceptance of the second stage should be a single acceptance of the waterway and circuit transformation. Consumers should check whether all the transformation lines are unobstructed, whether the layout is reasonable, whether the operation is normal, and reconfirm the line transformation under the operation of a professional hydraulic or electrician. Actual size. Only after the line is changed, the putty worker can continue to seal the wall and putty.

3, carpentry work size

The third acceptance must be done after the carpentry foundation. At this time, ceilings and plaster lines in the room should also be completed. Wall tiles in the kitchen and bathroom are already attached. At the same time, the painted wall should be scraped twice. Putty. Acceptance work at this stage is very important, consumers should carefully check the drawings, confirm the size of the parts, such as found inconsistent place, promptly prompt the construction team to modify.

4, woodworking work quality

When all the fine wood products are finished with a veneer and the wooden thread is nailed, the consumer can perform the fourth stage of acceptance. This time is basically half of the time, the inspection of this stage should focus on the color and texture of wood products and large areas of flatness and gaps are uniform.

After the completion of wood products, oil workers can start the primer treatment work, and all floor tiles should also be posted in this stage, which is the fifth stage in the phased acceptance.

5, after completion

The final phase of acceptance is the most comprehensive and thorough. Consumers are required to check the installation of footboards, sanitary ware and hardware, whether the finish of wooden products is in place, whether the paint on the wall or top surface is uniform, whether the panel of the electrician is properly installed and the position of the light fixture, and whether the circuit connection is correct. In addition, consumers should require the construction team to clean the room thoroughly before moving back.

Home inspection decoration start preparation entrance decoration room paint coating decoration decoration company bathroom ceiling material bathroom ceiling bathroom floor tile bathroom size

Manual Ethanol Fireplace

Manual Ethanol Fireplace,Mini Manual Burner Fireplace,Length Bio Burner Fireplace,Bio Ethanol Glass Fireplace

JINAN LODOR CNC EQUIPMENT CO.,LTD , https://www.zgfireplace.com

This entry was posted in on