The most detailed decoration stay book

1, the original ID card

2. Copy of ID card 3 is printed on the same sheet using b5 paper with the residence booklet

3, home book / account card original

4. Copy of residence booklet/account card with b5 paper and ID card on the same paper

5, the original payment receipt original purchase

6, copy of the first payment invoice for the purchase of the home if the area changes need to re-copy

7. Original receipts of property agency agency fee receipts

8, copy of the property agency agency fee receipt 3 copy with b5 paper

9. Original purchase and loan contract

10, copy of the purchase contract and loan contract 1a4 paper (prepared for free)

11. The name of person is 11cm square

12. Owners / Permanent Population Photo 3

Collection bleeding

13. The balance of housing payment (measured area - contract area) * unit price

14, comprehensive land price (total purchase price -4000* approval area)*10)%

15, Deed Tax Total Price * 1.5%

16, Stamp tax total price *0.03%

17, 5 yuan license fee

18, fee 12 yuan

19. Property registration fee is 40 yuan

Property paid

20. Property Management Fee Total Housing Area * December * 1.05 Yuan/m2 Month

21. Collective service fees

22. The total heating area for housing * 30 yuan/m2

23, elevator operation service fee

24, pump operation service fee

25, decoration management service fee

Generation fees

26, domestic garbage clear freight December * 2.5 yuan / month households

27, viewing fee in December * 12 yuan / month households

28, TV network fee 300 yuan / household

29, maintenance fund total housing price *2%

30. Public electricity costs 100 yuan/household

31、Pre-receiving water fee 300 yuan/household

32, decoration deposit 2000 yuan / household

Home Inspection Collection

33, inspection room collection 1 other rather forget it can not forget this

34, 1 stick/hammer

35. 3-4 staff

36, tape measure 1

37, triangle ruler 1

38, pencil 1

39. Pen 1

40, mineral water> = N to spend a lot of money with the property fee

41, change 2-5 yuan ready to copy new housing invoices and other uses

Acceptance documents (provided by the developer)

42. Copy of Filing Documents --- Five Certificates

43, Residential Quality Assurance

44. Residential Manual

45. Certificate of Quality of Construction Engineering

46. ​​Comprehensive acceptance certificate of completion of real estate development and construction projects

47. Completion Acceptance Record Form Check whether each item is filed

48, issued by the Beijing Housing and Land Management Bureau or the surveying and mapping team issued by the regional bureau directly affiliated mapping team, according to relevant regulations, each item on the “Completion Acceptance Record Form” must be reported to the competent authority for the record

When you inspect your house, you can't just look at the developer's record table, but at the same time, you must check carefully whether all items are filed, such as firefighting facilities. The “Completion Acceptance Record Form” has a strict restriction on real estate developers. Once the project is submitted to the competent authority for record, the developer must be responsible for the real estate for a lifetime and a problem arises. If it is the fault of the developer, it can be held accountable.

Acceptance project

Security door

49. Whether the door frame is correct or not, whether the sides of the tape measure are parallel

50, stripping paint / flow drop surface scratches / paint marks

51, whether there is a pit bump

52. Is the closure tight (especially the locked side)/flexible/warped/is there a special sound?

53、Whether the door lock is complete/flexible/out-of-spring

54, whether the hardware is rusty

Door frame

55, whether to reserve the door frame tape measure is parallel

wall

56, crack phenomenon with a small hammer (stick) tap. Hearing the voice of “empty”, all surfaces are in contact with the wall (ground) surface and need to be reworked;

57, cracks visually check the surface of the wall for cracks

58、Whether there is moisture in the insulation layer? The phenomenon of insulation layer is problematic. This phenomenon is best detected in winter.

59、Whether the wall is inclined or not, the accuracy and evenness of the right angle of the corner can be measured with a triangle ruler

60、Whether there is a crack in the corner wall corner

61、Whether there is a crack in the corner and ground contact

Top tenants

62. Is the ceiling due to water leakage due to water traces?

balcony

63, cracks visually check whether the balcony is connected with the two houses have cracks

64、Inside and outside cracks visually check whether there are cracks in the inner and outer walls of the balcony

65, whether there is water on the sealed balcony

window

66. Whether the parallel or end of the window frame is used to measure whether the tape measure is parallel to the height of the two sides to the ground; the window frame interface window and the concrete interface have no gaps.

67, close the window to hear the sound insulation effect / visual close

68. Is the closure flexible/smooth/in place?

69, leaking to see if the window sill water

70, screen window asks how to open the window without industry

71, inside and outside the window sill visually check for broken cracks

72, glass visual glass scratches

73, the appearance of paint off, whether scratches, bumps

74, whether the hardware is rusty

Water pipe

75, seepage, leakage, blocking open the tap, try to open

76. Is there any rust along the pipeline?

Radiator/tube

77, the water supply pipe connected to the inlet pipe is higher than the connection cooling gas port

78, the return pipe connection cooling gas port is higher than the connection of the water pipe port

79、Whether the heating pipeline is piped through the wall and through the floor should be provided with casing (in the intersection of the pipeline and the wall or floor, put a small pipe on the pipe), the casing on the ground should be higher than the ground 2 - 3 cm. The ground is newly renovated and should be 5 cm above the ground. Its role is to prevent the heating pipe from swelling and shrinking and then arching the wall and floor.

80、Whether there is rust in the pipeline along the road

bathroom

91. Whether the leakage is sealed off and the groundwater is drained for 24 hours to see if there is any trace of water in the bottom layer.

92. Whether or not to store water first and then release water to see if there is stagnant water

93, the top layer to see if there is water at the top, there is no mold

94. The power socket in the socket bathroom should be a moisture-proof socket and have splash protection measures

Inspection room balcony window housing outlet heating paint elevator door glass door bathroom door bathroom leak

D50mm above Magnet

Flat Bar Magnetic,Flat Bar Magnet,Bar Flat Magnetic

Jammymag Electronic S&T Co., Ltd. , http://www.xmmagnet.com

This entry was posted in on