1, the original ID card
2. Copy of ID card 3 is printed on the same sheet using b5 paper with the residence booklet
3, home book / account card original
4. Copy of residence booklet/account card with b5 paper and ID card on the same paper
5, the original payment receipt original purchase
6, copy of the first payment invoice for the purchase of the home if the area changes need to re-copy
7. Original receipts of property agency agency fee receipts
8, copy of the property agency agency fee receipt 3 copy with b5 paper
9. Original purchase and loan contract
10, copy of the purchase contract and loan contract 1a4 paper (prepared for free)
11. The name of person is 11cm square
12. Owners / Permanent Population Photo 3
Collection bleeding
13. The balance of housing payment (measured area - contract area) * unit price
14, comprehensive land price (total purchase price -4000* approval area)*10)%
15, Deed Tax Total Price * 1.5%
16, Stamp tax total price *0.03%
17, 5 yuan license fee
18, fee 12 yuan
19. Property registration fee is 40 yuan
Property paid
20. Property Management Fee Total Housing Area * December * 1.05 Yuan/m2 Month
21. Collective service fees
22. The total heating area for housing * 30 yuan/m2
23, elevator operation service fee
24, pump operation service fee
25, decoration management service fee
Generation fees
26, domestic garbage clear freight December * 2.5 yuan / month households
27, viewing fee in December * 12 yuan / month households
28, TV network fee 300 yuan / household
29, maintenance fund total housing price *2%
30. Public electricity costs 100 yuan/household
31ã€Pre-receiving water fee 300 yuan/household
32, decoration deposit 2000 yuan / household
Home Inspection Collection
33, inspection room collection 1 other rather forget it can not forget this
34, 1 stick/hammer
35. 3-4 staff
36, tape measure 1
37, triangle ruler 1
38, pencil 1
39. Pen 1
40, mineral water> = N to spend a lot of money with the property fee
41, change 2-5 yuan ready to copy new housing invoices and other uses
Acceptance documents (provided by the developer)
42. Copy of Filing Documents --- Five Certificates
43, Residential Quality Assurance
44. Residential Manual
45. Certificate of Quality of Construction Engineering
46. ​​Comprehensive acceptance certificate of completion of real estate development and construction projects
47. Completion Acceptance Record Form Check whether each item is filed
48, issued by the Beijing Housing and Land Management Bureau or the surveying and mapping team issued by the regional bureau directly affiliated mapping team, according to relevant regulations, each item on the “Completion Acceptance Record Form†must be reported to the competent authority for the record
When you inspect your house, you can't just look at the developer's record table, but at the same time, you must check carefully whether all items are filed, such as firefighting facilities. The “Completion Acceptance Record Form†has a strict restriction on real estate developers. Once the project is submitted to the competent authority for record, the developer must be responsible for the real estate for a lifetime and a problem arises. If it is the fault of the developer, it can be held accountable.
Acceptance project
Security door
49. Whether the door frame is correct or not, whether the sides of the tape measure are parallel
50, stripping paint / flow drop surface scratches / paint marks
51, whether there is a pit bump
52. Is the closure tight (especially the locked side)/flexible/warped/is there a special sound?
53ã€Whether the door lock is complete/flexible/out-of-spring
54, whether the hardware is rusty
Door frame
55, whether to reserve the door frame tape measure is parallel
wall
56, crack phenomenon with a small hammer (stick) tap. Hearing the voice of “emptyâ€, all surfaces are in contact with the wall (ground) surface and need to be reworked;
57, cracks visually check the surface of the wall for cracks
58ã€Whether there is moisture in the insulation layer? The phenomenon of insulation layer is problematic. This phenomenon is best detected in winter.
59ã€Whether the wall is inclined or not, the accuracy and evenness of the right angle of the corner can be measured with a triangle ruler
60ã€Whether there is a crack in the corner wall corner
61ã€Whether there is a crack in the corner and ground contact
Top tenants
62. Is the ceiling due to water leakage due to water traces?
balcony
63, cracks visually check whether the balcony is connected with the two houses have cracks
64ã€Inside and outside cracks visually check whether there are cracks in the inner and outer walls of the balcony
65, whether there is water on the sealed balcony
window
66. Whether the parallel or end of the window frame is used to measure whether the tape measure is parallel to the height of the two sides to the ground; the window frame interface window and the concrete interface have no gaps.
67, close the window to hear the sound insulation effect / visual close
68. Is the closure flexible/smooth/in place?
69, leaking to see if the window sill water
70, screen window asks how to open the window without industry
71, inside and outside the window sill visually check for broken cracks
72, glass visual glass scratches
73, the appearance of paint off, whether scratches, bumps
74, whether the hardware is rusty
Water pipe
75, seepage, leakage, blocking open the tap, try to open
76. Is there any rust along the pipeline?
Radiator/tube
77, the water supply pipe connected to the inlet pipe is higher than the connection cooling gas port
78, the return pipe connection cooling gas port is higher than the connection of the water pipe port
79ã€Whether the heating pipeline is piped through the wall and through the floor should be provided with casing (in the intersection of the pipeline and the wall or floor, put a small pipe on the pipe), the casing on the ground should be higher than the ground 2 - 3 cm. The ground is newly renovated and should be 5 cm above the ground. Its role is to prevent the heating pipe from swelling and shrinking and then arching the wall and floor.
80ã€Whether there is rust in the pipeline along the road
bathroom
91. Whether the leakage is sealed off and the groundwater is drained for 24 hours to see if there is any trace of water in the bottom layer.
92. Whether or not to store water first and then release water to see if there is stagnant water
93, the top layer to see if there is water at the top, there is no mold
94. The power socket in the socket bathroom should be a moisture-proof socket and have splash protection measures