Analysis of risk management and evaluation methods for building fire engineering

1 Introduction

The ancients said: “There are accidents in the sky.” Building fire engineering is an open system. In the course of its implementation, it will inevitably be affected by a variety of uncertainties, especially some large-scale projects. Large, long construction period, complex technical conditions, coupled with people's limitations in the planning and design, so that in the process of construction and operation will inevitably encounter a variety of adverse factors, and then trigger the entire fire engineering progress, quality, The risk that security and cost control objectives cannot be achieved will cause huge losses to the people of the country. Therefore, the identification, analysis and evaluation of risks in the construction of fire protection, and how to deal with and monitor these risks are problems that we must face and value. These are the contents of the research on the risk management of construction fire engineering.

To carry out research on risk management and fire engineering methods for building fire protection projects is to implement the principle of “prevention-oriented, prevention-disinfection combined” in China's fire protection policy. Understanding the knowledge of fire risk management allows us to control the investment, progress and quality of building fire engineering through scientific methods. The risk management of building fire engineering is a part of the fire safety process. It runs through the entire process of building fire engineering. Applying the fire risk management theory helps to balance the specific requirements of different phases of fire construction and operation in construction projects. Therefore, studying the risk management of building fire engineering is of great significance to fire safety.

2. Construction Fire Engineering Risk

2.1 Classification of Risks and Risks

The risk of building fire engineering is the possibility that this goal cannot be achieved under the conditions specified in the engineering objectives. It contains two elements: (a) the potential for the occurrence of an event, which we define as the project risk rate (RiskProbability); and (b) the consequences of negative adverse events.

2.2 The characteristics of building fire engineering risk

(1) The objectivity of building fire engineering risk. The risk of building fire engineering is always objective. Whether it is natural disasters, wars, or social life conflicts, conflicts, or carelessness, it is not based on human will. However, as people recognize the improvement of the world level, people's understanding of the regularity of risk is constantly improving, which creates the conditions for the scientific management of the risk of building fire engineering. (2) Uncertainty in the risk of construction fire engineering. Whether or not a risk event occurs, when it occurs, and what consequences it will cause are uncertain. However, people can make a certain degree of analysis and prediction based on historical data and experience. (3) The variability of risk in building fire engineering. When the risk factor changes, the possibility of risk and the consequences of the risk change. (4) The stage of construction fire engineering risk. It includes potential phases, occurrence phases, and consequences phases.

3. Risk identification of building fire engineering

Fire engineering risk identification is the first and important step of risk management. Risk identification is to determine what risks exist in the implementation of engineering projects, what impact these risks may have on the project, and archive these risks and their characteristics.

3.1 Risk Identification Process and Method

The risk identification method for building fire engineering is often empirical data analysis, risk investigation, expert consultation and experimental demonstration. In the analysis of empirical data, attention should be paid to the collection of similar building data, including file records, project summary, project quality, engineering acceptance data, and safety accident handling documents in the past construction process, to find relevant reference data. In the risk investigation, an initial risk list for building fire engineering is established through risk decomposition. After the initial risk list is established, it is still necessary to further identify the risks according to the characteristics of the construction project itself, and make necessary amendments and supplements in practice. Expert consultations can generally convene meetings of relevant experts to put forward their own opinions on the fire protection programs for special buildings. Questionnaire surveys can also be used to express their views on an independent basis. Then, the opinions issued by experts from the risk managers are summarized, classified, and analyzed.

3.2 Take a Large Home Shopping Mall in Wenzhou as an Example

The home shopping mall has 7 floors above ground, 39.9 meters high, about 10,700 square meters of floor space, and about 3,300 square meters of underground building area. First of all, as far as possible to list the entire building fire engineering risk list: (1) the problems existing in the construction unit. Some construction units have obtained higher construction profits by reducing fire engineering investment and using substandard fire protection products. Do not attach importance to the quality of fire engineering, for the sake of economic interests, and the construction unit to reach an agreement of interest; some construction units in order to shorten the construction period, in violation of the relevant provisions of the "Fire Protection Law", do not apply for the review of fire design drawings before the start of the project, while design, edge Construction and side audits have caused buildings to have congenital fire hazards; some construction companies have made false biddings for fire protection projects according to the intentions of the leaders, or choose companies with low quotations for construction, and these companies only provide returns for profits. Can reduce the construction quality of fire engineering. (2) Problems with the design organization. Due to the influence of the market economy environment and the unreasonable requirements for the construction unit, we cannot adhere to the principle, do not design from the objective reality of the construction project itself, and deceive the drawing examination department together with the construction unit, resulting in many concealed design drawings. The problem has caused fire hazards that cannot be rectified for the building, and a few design units have just been established. The relevant design professional and technical personnel are affiliated with other units, and they do not have the design capability to produce a map, resulting in the design of building fire fighting facilities. Supporting; for some construction projects, construction time is tight, the design unit to meet the requirements of the construction unit, simplify the design process, the professional designers can not fully coordinate and communicate with each other, resulting in lack of plans, drawings and design drawings of the architectural engineering design drawings can not meet Firefighting requirements are common. (3) Problems existing in the fire engineering construction unit. In order to obtain higher profits, some construction companies have violated laws and disciplines, and have shown that they have been guilty of cutting corners and cutting materials, lowering standards, relocating Party A’s illegal operations, and violating regulations, resulting in poor installation of the building’s fire protection system and congenitally deficient. Furthermore, due to the interests of some construction units, such as the qualifications of affiliation, procurement only depends on factors such as low prices and quality, leading to a significant decline in the reliability of building fire engineering. At the same time, supervision is not in place, testing companies give money and other aspects are also the inherent risk of building fire engineering.

Reflected in the project, the specific manifestations are: (1) The design of the fire protection system is irrational: For example, the spray on the seventh floor of the mall is set to be a side spray, and the walkway cannot be completely protected; the design of the fire rescue window is irrational. The number is insufficient, and the opening position is not a public safety area. (2) Unreasonable installation of fire-fighting equipment: For example, fire-retardant curtains are separated by shops and are not able to start and stop normally; spray pipes and sprinkler heads are not installed according to design drawings.

4. Risk assessment of building fire engineering

Building fire engineering risk assessment is the analysis of the probability of risk events, the resulting losses and the effects of their effects, as well as the joint actions and impacts of various risk events, in order to further develop risk management plans and identify risk responses. Measures and risk monitoring provide the basis. The risk assessment of building fire engineering is divided into risk assessment and risk assessment.

4.1 Risk Assessment of Building Fire Engineering

The risk assessment of a building fire engineering project analyzes the likelihood of a risk event and the consequences of a risk event. It provides the basis for analyzing the entire engineering risk or a certain type of risk.

4.1.1 Risk Assessment Method

In building fire engineering risk assessment, risk factors and risk events are usually described by establishing a model, and the risk is estimated by calculating the model. Many countries in this area have achieved some results, and have been widely used in performance design: the United States' Building Fire Safety Evaluation Method (BFSEM: TheBuildingFireSafetyEvaluationMethod); Australia's Risk Assessment Model (RAM: RiskAssessmentModeling); Canada's FIRECAM method.

4.1.2 Estimated Probability of Risk Events

The analysis of the probability or probability distribution of risk events is the basis for risk assessment of building fire engineering. The probability distribution of risk events should be determined by historical data and data, that is, the so-called objective probability; when there is not enough historical data and data to determine the probability distribution of risk events, the theoretical probability distribution or subjective probability can be used for risk assessment. When the probability distribution is obtained, the probability of occurrence of the risk event can be calculated according to the risk calculation model.

4.1.3 Risk Loss Estimate

Estimates of the risk of construction fire engineering losses include investment risk, schedule risk, quality risk, and safety risk. The ultimate risk can be summarized as economic losses.

4.1.3.1 Estimation of maximum one-time loss

The indicator of one-time maximum loss of a risk event is very important, because if a large amount of loss falls on a building fire protection project at one time, the project is likely to be terminated due to lack of liquidity; but the same amount of loss, if more For a long period of time, it can be managed to make up for it through financial adjustments.

4.1.3.2 Estimated Loss of the Project as a Whole

The overall loss here means that when a one-time loss is caused, it usually affects the later stage and results in an overall loss. This type of loss is usually not taken into account in the loss estimate, thus making the estimate of the loss inaccurate.

4.2 Risk Assessment of Building Fire Engineering

The risk evaluation of building fire engineering is based on the risk assessment to further analyze the joint effects of various risk events, the comprehensive consequences of the loss, and whether the project subject can accept these risks. Through risk assessment, it is possible to determine the order of risk, determine the internal links between risk events, and grasp the interrelationships between risks. It is also possible to further understand the estimated probability of occurrence of risks and the resulting losses, and to reduce the risk estimates. Certainty to be able to identify risk response measures.

4.2.1 Risk Assessment Criteria

The risk assessment standard is that the project owner determines the acceptable risk rate for different risks. For example, Yangzi Petrochemical-BASF Co., Ltd. has applied the risk assessment standards for the frequency and possible risks of leakage of its ethylene horizontal tank STT1061 tank and its accessories. Although this is an overall risk assessment standard for petrochemical projects, it has The strong representation can play a strong reference role in the formulation of risk assessment standards for building fire engineering.

The use of ALARP triangles to represent the proposed IRPA standard is a result of Yangba's comparison and analysis of numerous foreign standards, as well as its own company's situation. For different types of building fire engineering, the probability and the consequences of various risks are different. The risk rate that the subject can bear varies. Therefore, the risk assessment standards used for different types of building fire engineering are different.

12 The rest of the page is displayed

5. Risk Response and Risk Management of Building Fire Engineering

Through the identification, estimation and evaluation of building fire engineering, risk managers should have a certain degree of certainty about the various risks and potential losses. On this basis, risk managers will need to respond to risks: First, they must formulate a practical and feasible risk response plan; secondly, choose among many countermeasures to avoid, transfer, mitigate, accept, and use risks. An effective strategy to try to turn risks into opportunities or to minimize the negative effects of risks.

5.1 Risk Response Plan and Strategy

Building a fire protection project risk response plan is a process of formulating a risk strategy (or plan) and a countermeasure. The purpose is to increase the chances of achieving the project goals and reduce the threats to the project. The commonly used risk response strategies and measures for building fire engineering include risk aversion, risk transfer, risk mitigation, risk retention, and risk utilization, as well as a combination of these strategies. The determination of risk management strategies and measures for building fire engineering needs to be considered in terms of both effectiveness and cost.

5.2 Ways to Avoid Risks

There are two ways to avoid risks: (1) Avoid the risk of risk events. For example, a building uses a special large space in the design of the project, and firefighting design requires the use of special technical measures. Although this firefighting technology program seems feasible, it has not been approved by the firefighting department. After expert consultation and experimental demonstration, it has found that its firefighting measures have considerable uncertainty in terms of investment and progress, that is, the risks are relatively high. Big. In the preliminary design, the owner decided not to adopt this fire protection plan and improve the architectural design of the building. This avoids the risk of risk events. (2) Avoid possible loss after a risk event occurs. For example, the number of fire hydrants, fire extinguishers, emergency lights, and fire doors installed in a building, the addition of smoke prevention systems, the widening of evacuation passages, and the installation of different fire extinguishing systems depending on the nature of use of the building, etc. The possibility, but can effectively reduce the loss caused by the fire after the fire occurred, that is, to avoid losses caused by risk events.

5.2.1 Risk Aversion Planning System

In building fire engineering, the risk aversion planning system can be composed of three parts: prevention plan, disaster plan and emergency plan. The purpose of the prevention plan is to avoid risks in a targeted manner. It can be implemented through organizational measures and management measures. The disaster plan is a set of pre-programmed and definite working procedures and specific measures to deal with all serious and vicious emergencies with ease, timely and properly, and ultimately reduce casualties and economic losses. The contingency plan is a treatment plan after the risk loss is basically determined. The purpose of the contingency plan is to speed up the process of resuming the interruption and control the extent of the impact to a minimum.

5.2.2 Limitations of risk aversion

Risk aversion also has certain limitations: (1) Under certain conditions, risk aversion will lose some opportunities or hinder innovation. (2) Risk aversion is greatly restricted by information. When risk identification and risk estimation have not been fully grasped, risk aversion strategies will be greatly affected. (3) Strategies to adopt risk aversion are sometimes unrealistic and avoid risks. At the same time also lost some of the possibility of gaining from risk.

5.3 Risk Transfer

Risk transfer is the transfer of the results of a risk, along with the rights and responsibilities for risk response, to the other party, and it is up to the parties to take risks. For example, in the fire engineering project decision-making risk should be borne by the owner, the design risk should be borne by the designer, construction and installation technology risk should be borne by the contractor, and the operational risk should be borne by the property management.

Risk transfer can be divided into non-insurance transfer and insurance transfer.

5.3.1 Non-insurance transfer

Non-insurance risk transfer is the transfer of risk through contract conditions and contract language. For example, on the basis of satisfying the mandatory design provisions and standards and standards, the initial fire protection investment can be appropriately reduced by strengthening the fire management measures put into operation.

5.3.2 Insurance Transfer

As a way of risk transfer, insurance is an important strategy and measure to deal with the risk of fire protection engineering. Building fire engineering has a large investment, a long construction period, and a large number of potential risk factors. The owners and contractors often use insurance methods to pay a small amount of insurance fees in exchange for compensation for losses.

5.4 Risk retention

Risk self-retention, also known as risk acceptance, is a kind of risk response strategy that involves the project's own risks. Risk retention is used for the disposal of residual risks. In the face of numerous risks, there are always risks and losses that are difficult to grasp, and the main body of the project undertakes or retains them.

5.5 Risk Utilization

Risk utilization is a higher level of risk response for construction fire engineering projects. It focuses on the risks of some speculative risks. By grasping and controlling risks, it can turn adverse development into opportunities for development. For example, the bid price for a building fire engineering project is generally a major factor, but this is not the only criterion.

5.6 Construction Fire Engineering Risk Management Decision

The decision-making of risk management in fire engineering of a building is that the risk manager chooses a satisfactory plan through analysis, evaluation and judgment from a number of possible implementation plans on the basis of possessing certain information.

6. Comprehensive evaluation

Each step of the risk management of a building fire engineering project is very important. The former step is the premise and basis of the latter. However, according to different specific circumstances, the priorities must be analyzed. In general, for the development of more mature building fire engineering, such as the above-mentioned Yamba Petrochemical case, the choice of risk response method is more important; and for the development of not mature building fire engineering and its branch systems, such as performance design Risk assessment is particularly important.

6.1 Risk Assessment Method Selection

The risk estimation method mainly depends on the established model. The selection of the model should be based on the characteristics of the building fire engineering project to be estimated. At present, there are few risk assessment models in China. Most of them adopt the models developed by foreign authoritative organizations, and the selection of models is even more important. It is a blank space.

The selection of risk assessment methods should be based on the project entity's own situation and the characteristics of risk, and then choose different risk assessment standards for risk assessment. If the project's main body of funds and technical strength is relatively strong, you can choose a more stringent evaluation criteria; You can choose a more relaxed evaluation criteria. In this respect, our country mainly adopts some foreign shaped systems, and especially some mature industries can learn from their own circumstances. However, those industries that are not mature enough lack the basis for reference. They need relevant experts, especially the industry's own building fire engineering experts to study and formulate standards.

6.2 Risk Coping Style Selection

The choice of risk response method is closely linked with risk assessment. The result of risk assessment directly determines the choice of risk response method. Usually the most basic risk response method is risk aversion, because risk aversion eliminates risk from the source and eliminates risk effects in the most thorough way. However, specific analysis is also required for different situations. For example, risks with a high probability of occurrence of risk are almost only taken with risk aversion. Risks with large risk losses should be combined with risk transfer, risk transfer, and risk mitigation, especially when the loss is greater. The risk of insurance, the risk of insurance transfer is also very important; and the risk of a single event is less likely, but the project is more complex, more risk factors are latent, the risk transfer method is more reasonable; residual risk , managers must take risks to stay.

At present, the development of related technologies in China's building fire engineering is still in its infancy. Fire safety engineering, risk assessment system, fire economics, insurance industry and related laws and regulations are all imperfect factors that have seriously affected risk managers. Dealing with the relationship between risk assessment and risk response, managers can not find the key point in the process of risk management, wasting a lot of funds and energy of the engineering body, causing unnecessary losses, and ultimately constraining the development of risk management of construction fire engineering.

7. Conclusion

The risk management of building fire engineering is an important part of fire protection. It plays a pivotal role in the entire building fire engineering. Through the research on the risk management of building fire engineering, it can effectively avoid or reduce the loss of building fire engineering, and it plays a powerful role in promoting the performance design of fire protection, and provides technical support for comprehensive fire analysis theory. This article has only given a preliminary explanation of the process of construction fire engineering management. Domestic research in this area has just started, but with the gradual improvement of domestic fire protection, foreign companies and technology intervention, I believe that the construction of fire engineering risk management will be In the near future, there will be considerable development.

12 The rest of the page is displayed

Abstract : This article starts from the perspective of the problems faced by the construction fire engineering and combines with the current development status of building risk management in China. Through the analysis of risk identification, risk assessment and risk response, combined with individual cases, the concept of building fire engineering risk management is described. The system proposes measures for assessing and responding to the risks of building fire engineering, and aims to promote the development of the risk management of building fire engineering in China.

Keywords: risk building fire engineering risk assessment risk management

1 Introduction

The ancients said: “There are accidents in the sky.” Building fire engineering is an open system. In the course of its implementation, it will inevitably be affected by a variety of uncertainties, especially some large-scale projects. Large, long construction period, complex technical conditions, coupled with people's limitations in the planning and design, so that in the process of construction and operation will inevitably encounter a variety of adverse factors, and then trigger the entire fire engineering progress, quality, The risk that security and cost control objectives cannot be achieved will cause huge losses to the people of the country. Therefore, the identification, analysis and evaluation of risks in the construction of fire protection, and how to deal with and monitor these risks are problems that we must face and value. These are the contents of the research on the risk management of construction fire engineering.

To carry out research on risk management and fire engineering methods for building fire protection projects is to implement the principle of “prevention-oriented, prevention-disinfection combined” in China's fire protection policy. Understanding the knowledge of fire risk management allows us to control the investment, progress and quality of building fire engineering through scientific methods. The risk management of building fire engineering is a part of the fire safety process. It runs through the entire process of building fire engineering. Applying the fire risk management theory helps to balance the specific requirements of different phases of fire construction and operation in construction projects. Therefore, studying the risk management of building fire engineering is of great significance to fire safety.

2. Construction Fire Engineering Risk

2.1 Classification of Risks and Risks

The risk of building fire engineering is the possibility that this goal cannot be achieved under the conditions specified in the engineering objectives. It contains two elements: (a) the potential for the occurrence of an event, which we define as the project risk rate (RiskProbability); and (b) the consequences of negative adverse events.

2.2 The characteristics of building fire engineering risk

(1) The objectivity of building fire engineering risk. The risk of building fire engineering is always objective. Whether it is natural disasters, wars, or social life conflicts, conflicts, or carelessness, it is not based on human will. However, as people recognize the improvement of the world level, people's understanding of the regularity of risk is constantly improving, which creates the conditions for the scientific management of the risk of building fire engineering. (2) Uncertainty in the risk of construction fire engineering. Whether or not a risk event occurs, when it occurs, and what consequences it will cause are uncertain. However, people can make a certain degree of analysis and prediction based on historical data and experience. (3) The variability of risk in building fire engineering. When the risk factor changes, the possibility of risk and the consequences of the risk change. (4) The stage of construction fire engineering risk. It includes potential phases, occurrence phases, and consequences phases.

3. Risk identification of building fire engineering

Fire engineering risk identification is the first and important step of risk management. Risk identification is to determine what risks exist in the implementation of engineering projects, what impact these risks may have on the project, and archive these risks and their characteristics.

3.1 Risk Identification Process and Method

The risk identification method for building fire engineering is often empirical data analysis, risk investigation, expert consultation and experimental demonstration. In the analysis of empirical data, attention should be paid to the collection of similar building data, including file records, project summary, project quality, engineering acceptance data, and safety accident handling documents in the past construction process, to find relevant reference data. In the risk investigation, an initial risk list for building fire engineering is established through risk decomposition. After the initial risk list is established, it is still necessary to further identify the risks according to the characteristics of the construction project itself, and make necessary amendments and supplements in practice. Expert consultations can generally convene meetings of relevant experts to put forward their own opinions on the fire protection programs for special buildings. Questionnaire surveys can also be used to express their views on an independent basis. Then, the opinions issued by experts from the risk managers are summarized, classified, and analyzed.

3.2 Take a Large Home Shopping Mall in Wenzhou as an Example

The home shopping mall has 7 floors above ground, 39.9 meters high, about 10,700 square meters of floor space, and about 3,300 square meters of underground building area. First of all, as far as possible to list the entire building fire engineering risk list: (1) the problems existing in the construction unit. Some construction units have obtained higher construction profits by reducing fire engineering investment and using substandard fire protection products. Do not attach importance to the quality of fire engineering, for the sake of economic interests, and the construction unit to reach an agreement of interest; some construction units in order to shorten the construction period, in violation of the relevant provisions of the "Fire Protection Law", do not apply for the review of fire design drawings before the start of the project, while design, edge Construction and side audits have caused buildings to have congenital fire hazards; some construction companies have made false biddings for fire protection projects according to the intentions of the leaders, or choose companies with low quotations for construction, and these companies only provide returns for profits. Can reduce the construction quality of fire engineering. (2) Problems with the design organization. Due to the influence of the market economy environment and the unreasonable requirements for the construction unit, we cannot adhere to the principle, do not design from the objective reality of the construction project itself, and deceive the drawing examination department together with the construction unit, resulting in many concealed design drawings. The problem has caused fire hazards that cannot be rectified for the building, and a few design units have just been established. The relevant design professional and technical personnel are affiliated with other units, and they do not have the design capability to produce a map, resulting in the design of building fire fighting facilities. Supporting; for some construction projects, construction time is tight, the design unit to meet the requirements of the construction unit, simplify the design process, the professional designers can not fully coordinate and communicate with each other, resulting in lack of plans, drawings and design drawings of the architectural engineering design drawings can not meet Firefighting requirements are common. (3) Problems existing in the fire engineering construction unit. In order to obtain higher profits, some construction companies have violated laws and disciplines, and have shown that they have been guilty of cutting corners and cutting materials, lowering standards, relocating Party A’s illegal operations, and violating regulations, resulting in poor installation of the building’s fire protection system and congenitally deficient. Furthermore, due to the interests of some construction units, such as the qualifications of affiliation, procurement only depends on factors such as low prices and quality, leading to a significant decline in the reliability of building fire engineering. At the same time, supervision is not in place, testing companies give money and other aspects are also the inherent risk of building fire engineering.

Reflected in the project, the specific manifestations are: (1) The design of the fire protection system is irrational: For example, the spray on the seventh floor of the mall is set to be a side spray, and the walkway cannot be completely protected; the design of the fire rescue window is irrational. The number is insufficient, and the opening position is not a public safety area. (2) Unreasonable installation of fire-fighting equipment: For example, fire-retardant curtains are separated by shops and are not able to start and stop normally; spray pipes and sprinkler heads are not installed according to design drawings.

4. Risk assessment of building fire engineering

Building fire engineering risk assessment is the analysis of the probability of risk events, the resulting losses and the effects of their effects, as well as the joint actions and impacts of various risk events, in order to further develop risk management plans and identify risk responses. Measures and risk monitoring provide the basis. The risk assessment of building fire engineering is divided into risk assessment and risk assessment.

4.1 Risk Assessment of Building Fire Engineering

The risk assessment of a building fire engineering project analyzes the likelihood of a risk event and the consequences of a risk event. It provides the basis for analyzing the entire engineering risk or a certain type of risk.

4.1.1 Risk Assessment Method

In building fire engineering risk assessment, risk factors and risk events are usually described by establishing a model, and the risk is estimated by calculating the model. Many countries in this area have achieved some results, and have been widely used in performance design: the United States' Building Fire Safety Evaluation Method (BFSEM: TheBuildingFireSafetyEvaluationMethod); Australia's Risk Assessment Model (RAM: RiskAssessmentModeling); Canada's FIRECAM method.

4.1.2 Estimated Probability of Risk Events

The analysis of the probability or probability distribution of risk events is the basis for risk assessment of building fire engineering. The probability distribution of risk events should be determined by historical data and data, that is, the so-called objective probability; when there is not enough historical data and data to determine the probability distribution of risk events, the theoretical probability distribution or subjective probability can be used for risk assessment. When the probability distribution is obtained, the probability of occurrence of the risk event can be calculated according to the risk calculation model.

4.1.3 Risk Loss Estimate

Estimates of the risk of construction fire engineering losses include investment risk, schedule risk, quality risk, and safety risk. The ultimate risk can be summarized as economic losses.

4.1.3.1 Estimation of maximum one-time loss

The indicator of one-time maximum loss of a risk event is very important, because if a large amount of loss falls on a building fire protection project at one time, the project is likely to be terminated due to lack of liquidity; but the same amount of loss, if more For a long period of time, it can be managed to make up for it through financial adjustments.

4.1.3.2 Estimated Loss of the Project as a Whole

The overall loss here means that when a one-time loss is caused, it usually affects the later stage and results in an overall loss. This type of loss is usually not taken into account in the loss estimate, thus making the estimate of the loss inaccurate.

4.2 Risk Assessment of Building Fire Engineering

The risk evaluation of building fire engineering is based on the risk assessment to further analyze the joint effects of various risk events, the comprehensive consequences of the loss, and whether the project subject can accept these risks. Through risk assessment, it is possible to determine the order of risk, determine the internal links between risk events, and grasp the interrelationships between risks. It is also possible to further understand the estimated probability of occurrence of risks and the resulting losses, and to reduce the risk estimates. Certainty to be able to identify risk response measures.

4.2.1 Risk Assessment Criteria

The risk assessment standard is that the project owner determines the acceptable risk rate for different risks. For example, Yangzi Petrochemical-BASF Co., Ltd. has applied the risk assessment standards for the frequency and possible risks of leakage of its ethylene horizontal tank STT1061 tank and its accessories. Although this is an overall risk assessment standard for petrochemical projects, it has The strong representation can play a strong reference role in the formulation of risk assessment standards for building fire engineering.

The use of ALARP triangles to represent the proposed IRPA standard is a result of Yangba's comparison and analysis of numerous foreign standards, as well as its own company's situation. For different types of building fire engineering, the probability and the consequences of various risks are different. The risk rate that the subject can bear varies. Therefore, the risk assessment standards used for different types of building fire engineering are different.

5. Risk Response and Risk Management of Building Fire Engineering

Through the identification, estimation and evaluation of building fire engineering, risk managers should have a certain degree of certainty about the various risks and potential losses. On this basis, risk managers will need to respond to risks: First, they must formulate a practical and feasible risk response plan; secondly, choose among many countermeasures to avoid, transfer, mitigate, accept, and use risks. An effective strategy to try to turn risks into opportunities or to minimize the negative effects of risks.

5.1 Risk Response Plan and Strategy

Building a fire protection project risk response plan is a process of formulating a risk strategy (or plan) and a countermeasure. The purpose is to increase the chances of achieving the project goals and reduce the threats to the project. The commonly used risk response strategies and measures for building fire engineering include risk aversion, risk transfer, risk mitigation, risk retention, and risk utilization, as well as a combination of these strategies. The determination of risk management strategies and measures for building fire engineering needs to be considered in terms of both effectiveness and cost.

5.2 Ways to Avoid Risks

There are two ways to avoid risks: (1) Avoid the risk of risk events. For example, a building uses a special large space in the design of the project, and firefighting design requires the use of special technical measures. Although this firefighting technology program seems feasible, it has not been approved by the firefighting department. After expert consultation and experimental demonstration, it has found that its firefighting measures have considerable uncertainty in terms of investment and progress, that is, the risks are relatively high. Big. In the preliminary design, the owner decided not to adopt this fire protection plan and improve the architectural design of the building. This avoids the risk of risk events. (2) Avoid possible loss after a risk event occurs.例如,在某建筑内加设消火栓、灭火器、应急灯、防火门的数量,增设防排烟系统,加宽疏散通道,根据建筑不同的使用性质安装不同的灭火系统等,这些都不能减少火灾发生的可能性,但可以在火灾发生后可以有效的减少火灾造成的损失,即规避风险事件造成的损失。

5.2.1风险规避计划系统

在建筑消防工程中,风险规避计划系统可由预防计划、灾难计划和应急计划三部分组成。预防计划的宗旨在于有针对性地规避风险,它可通过组织措施、管理措施等来实施。灾难计划是一组事先编制好的、目的明确的工作程序和具体措施,以在出现各种严重的、恶性的紧急事件发生后可以从容、及时、妥善地处理,最终减少人员伤亡和经济损失。应急计划是在风险损失基本确定后的处理计划,其目的是使加快恢复中断的过程,控制影响程度在最小的范围。

5.2.2风险规避的局限性

风险规避也存在一定的局限性:(1)在某些条件下,风险规避会丧失一些机会或阻碍创新。(2)风险规避受信息的制约较大,当风险识别和风险估计还没有充分把握时,风险规避的策略会受到很大的影响(3)采取风险规避的策略有时不太现实,回避风险的同时也失去了一些从风险中获得收益的可能性。

5.3风险转移

风险转移是将某风险的结果连同风险应对的权利和责任转移给他方,是由各方承担风险。例如,在消防工程项目决策风险应由业主承担、设计风险应由设计方承担,施工安装技术风险应由承包商承担,而运行使用的风险应由物业管理承担。

风险转移又可分为非保险转移和保险转移。

5.3.1非保险转移

非保险风险转移是通过合同条件和合同语言来进行风险转移。例如,在满足设计强制性条文和规范、标准的基础上,通过加强投入运行使用的消防管理措施,可适当减少初期的消防投入。

5.3.2保险转移

保险作为风险转移的一种方式,是应对建筑消防工程风险的一种重要策略和措施。建筑消防工程的投资较大、建设工期较长、潜伏的风险因素多,业主和承包商经常采用保险方法,支付少量的保险费用,以换得受到损失时得到补偿的保障。

5.4风险自留

风险自留亦称风险接受,时一种由工程主体自行承担风险后果的一种风险应对策略。风险自留用于残余风险的处置,面对众多的风险,总会有一些难以把握的风险及造成的损失,工程的主体自己承担或保留。

5.5风险利用

风险利用是建筑消防工程风险应对更高的一个层次,它主要针对一些投机性质的风险,通过对风险的把握和驾驭,可以化不利的后果为发展机遇。例如,建筑消防工程项目的投标,其价格因素一般是主要因素,但这不是唯一标准。

5.6建筑消防工程风险管理决策

建筑消防工程风险管理决策,就是风险管理者在占有一定的信息基础上,从若干可能实施的方案中,通过分析、评价和判断,选出满意的方案。

6.综合评价

建筑消防工程风险管理的每一个步骤都是十分重要的,前一个步骤是后一个的前提和基础,但根据不同的具体情况其轻重缓急也要具体的分析。一般来说,对于发展比较成熟的建筑消防工程,例如上述的扬巴石化的案例,对风险应对方法的选择就比较重要;而对于发展不够成熟的建筑消防工程及其分支系统,例如性能化设计,风险评估尤其重要。

6.1风险评估方法选择

风险估计方法主要取决于建立的模型,模型的选择要根据所要估计的建筑消防工程的特点,目前我国还鲜有风险估计的模型,大都采用国外权威机构所制定的模型,而模型的选择方面更是一片空白。

风险评价方法的选择要根据工程主体自身的情况和风险的特点,进而选择不同的风险评价标准进行风险评价,如果工程主体的资金和技术实力比较雄厚,则可以选择较为严格的评价标准;反之,则可以选择较为宽松的评价标准。在这方面,我国主要采用一些国外的成型的体系,尤其是一些比较成熟的行业可以根据自身的情况加以借鉴。不过那些不够成熟的行业则缺少借鉴的依据,需要有关的专家,尤其是行业自身的建筑消防工程专家来研究和制定标准。

6.2风险应对方式选择

风险应对方式的选择是与风险评估紧密相连的,风险评估的结果直接决定了风险应对方式的选择。通常最基本的风险应对方式是风险规避,因为风险规避从源头上消除风险,最彻底的消除风险影响的方法。但对于不同的情况也要具体分析,例如,风险发生概率大的风险,几乎只有采取风险规避;风险损失较大的风险要采取风险规避同风险转移、风险缓解相结合,尤其是一次损失较大的风险,保险的风险转移的方式也十分重要;而单个事件的风险发生概率较小,但工程比较复杂,潜伏的风险因素较多的情况,风险转移的方式就更加合理一些;对于残留的风险,管理者又要采取风险自留。

目前我国建筑消防工程各个相关技术的发展都尚处在初级阶段,消防工程学、风险评估体系、消防经济学、保险业以及相关法律法规等多方面因素的不完善,都严重影响了风险管理者对风险评估与风险应对关系的处理,使管理者在风险管理过程中无法找到重点,浪费了工程主体大量的资金和精力,造成了不必要的损失,最终制约了建筑消防工程风险管理的发展。

7.结束语

建筑消防工程风险管理是消防上一个重要的部分,它在整个建筑消防工程中起着举足轻重的作用。通过对建筑消防工程风险管理的研究,可以有效的避免或减少建筑消防工程的损失,对消防的性能化设计起着有力的促进作用,为综合消防分析理论提供了技术支持。本文对建筑消防工程管理的过程只是做了初步的阐述,国内在这方面的研究也刚刚起步,但是随着国内消防的逐渐完善,外国公司以及技术的介入,相信建筑消防工程风险管理将会在不久的将来能够得到比较长足的发展。