Floor covering considerations

The paving of the floor is complicated and not complicated. It is simple and has many floors to pay attention to. Today, Xiaobian will tell you a few precautions for floor coverings. Come check it out!

The floor needs to be reconciled to teach you to put out the perfect ground.

1. Retreat before paving

Whether it is solid wood flooring, laminate flooring or laminate flooring, the main material is wood, which is susceptible to weathering and thermal expansion and contraction. After the floor is bought home, it should be placed in the new living room or other places that are dry and protected from light for one to two days, so that the water content of the floor and the indoor water content are balanced to facilitate paving.

2, the ground needs to be kept dry and flat

Before the floor is paved, it is necessary to dry the ground one degree a week in advance, try to keep the ground dry for a long time, avoid the humidity is too high, and also ensure that the ground is flat. If the ground is not flat, the floor is prone to problems. After leveling the ground, you must wait until the newly paved cement is completely dry before you start to lay the floor to avoid bacterial growth.

3, pay attention to the expansion rate

The wood material will expand and contract due to the temperature, and the floor covering needs to be reserved for expansion joints to prevent deformation and cracking due to dry weather or moisture after the floor is paved. The floor expansion ratio of different brands will be different. The paving workers can choose the manufacturer's installer, don't do it by yourself.

4, the floor is laid to rest

After the floor covering is completed, do not walk or place heavy objects on it immediately. Leave 48 hours for the floor to rest and make the floor glue more fully, which will help the floor paving effect.

Summary of the small series: the floor covering needs to be meticulous, the temporary negligence may cause the paving effect is not ideal, the floor hidden danger, etc., so the front, middle and late stage of the pavement should pay more attention to avoid doing useless work.

Horse Panel

Hebei Haiao Wire Mesh Products Co., Ltd. , https://www.haiaowiremeshfencing.com

This entry was posted in on