Renovation Acceptance Notice Owners Acceptance Knowledge

A major event in the decoration life, it includes more content and scope. However, it is difficult for the decoration consumer to fully grasp all the decoration knowledge. Therefore, the decoration owner will do some preparation before the inspection, to understand some of the decoration acceptance considerations.

Decoration acceptance considerations

1, waterway

The waterway is an important link in the inspection of the house. When the owner checks and accepts the waterway, he must check the position of the water meter and know the outlet of the kitchen and the bathroom. The material of the water pipe is directly related to life. To determine whether it is a qualified material designated by the state, if the water pipe material is relatively poor, it is easy to leak water in the later period.

2, the circuit

The main circuit acceptance socket location, wire type and maximum power consumption equipment. In this way, the landlord and the property management must ask for the completion drawings of the circuit concealment project layout. In the course of future use, if there is a short circuit or water cut, it can be repaired by professionals according to the drawings. It is also necessary to observe whether the leakage protection switch of the distribution box is illuminated and whether the switch is valid.

3, air detection

With the change of concepts, environmental protection awareness has become a more important link in the renovation of owners. Air pollution is also a prominent problem in decoration pollution and is the main cause of many diseases. Therefore, the first thing the owner must do when checking into the room is to confirm whether the air quality is up to standard.

4, ceiling

For the acceptance of the ceiling, it cannot be observed from the naked eye. According to the relevant regulations, the light steel keel must be used for the concealed ceiling. The previously used wooden keel itself contains water, which is prone to contraction changes in the four seasons and has been eliminated. The light steel keel performance is very stable, and its service life is relatively long.

5, waterproof

Bathroom waterproofing is a very important point. When checking, check whether the water is open. There must be no accumulation of water for the lowest point of the floor drain, and there should be a smooth flow of water in each of the drains.

Editor's summary: On the decoration acceptance notice is introduced here, I hope to be helpful to everyone. If you want to know more related information, you can pay attention to this website information.

Water and electricity acceptance new house acceptance considerations decoration acceptance considerations

Magnetic Track Series

"Magnetic Track Light,Magnetic Track Lighting System ,Magnetic Track Light Ceiling,Track Light Magnetic"

FOSHAN CITY KURUI LIGHTING CO.,LTD , https://www.kuruilighting.com

This entry was posted in on